返回
Worker allocation in lean U-shaped production lines
DOI:10.1080/00207540601115997.png)
摘要
En 中文
U-shaped lines are widely used in lean systems. In U-shaped production lines, each worker handles one or more machines on the line: the worker allocation problem is to establish which machines are handled by which worker. This differs from the widely-investigated U-line assembly line balancing problem in that the assignment of tasks to line locations is fixed. This paper address the worker allocation problem for lean U-shaped production lines where the objectives are to minimize the quantity of workers and maximize full work: such allocations provide the opportunity to eliminate the least-utilized worker by improving processes accordingly. A mathematical model is developed: the model allows for any allocation of machines to workers so long as workers do not cross paths. Walking times are considered, where workers follow circular paths and walk around other worker(s) on the line if necessary. A heuristic algorithm for tackling the problem is developed, along with a procedure representing the 'traditional' approach of constructing standard operations routines. Computational experiments considering three line sizes (up to 20 machines) and three takt time levels are performed. The results show that the proposed algorithm both improves upon the traditional approach and is more likely to provide optimal solutions.
Keyword:
U-shaped line
lean production
worker allocation
full work
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
暂无机构信息
引用论文
没有更多内容

