arrow
Return

A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem

delete2018-11-01
delete18
PRE
AI
C
Changchun Liu
X
Xi Xiang
张
张灿荣 (Canrong Zhang)
王
王强 (Qiang Wang)
郑力 cover
郑力 (Li Zheng) *
DOI:10.1016/j.cie.2018.08.036delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This study develops a column generation-based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem. The proposed distributed algorithm shares less information among independent decision makers compared with the traditional integrated approach. In this problem, many independent processors, which can produce different types of products, coordinate with a resource manager (or third-party logistic), who provides different types of vehicles to deliver products to the customers. The problem is decomposed into two parts: production planning for individual processors and vehicle scheduling for the resource manager. A total of 1200 instances are randomly generated to verify the effectiveness of the proposed distributed algorithm. Results of computational experiments verify that the proposed distributed algorithm has good solution quality and calculation efficiency compared with the integrated approach, i.e., CPLEX, hybrid Benders Decomposition, and Lagrangian Relaxation. Lastly, a general framework for the distributed algorithm is proposed to solve a generalized problem.
Keywords:
Multi-mode resource constrained project scheduling problem
Distributed scheduling
Information-sharing
Column generation
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Computers and Industrial Engineering cover
Computers and Industrial Engineering
IF:
6.5
Papers:
1.0W
Citations:
3.8W

Organization

T
tsinghua university
Scholars:
11.9W
Papers: 10.0W
Citations: 137
Cited Papers

Cited Papers

A market-based multi-agent system model for decentralized multi-project scheduling
err2006-12-21
err111
PREAI
errConfessore, Giuseppe; Giordani, Stefano; Rismondo, Silvia
errShare
errSave
researcher View more