A constraint programming approach for the resource-constrained project scheduling problem
DOI:10.1007/s10479-007-0188-y.png)
Abstract
En 中文
A pure Constraint Programming approach for the Resource-Constrained Project Scheduling Problem (RCPSP) is presented. Our basic idea was to substitute the resource constraints by a set of sub-constraints generated as needed. Each of these sub-constraints corresponds to a set of tasks that cannot be executed together without violating one of the resource constraints. A filtering algorithm for these sub-constraints has been developed. When applied to the initial resource constraints together with known filtering algorithms, this new filtering algorithm provides very good numerical results.