arrow
Return

A fast finite loading algorithm for job oriented scheduling

delete1997-02-01
delete9
PRE
AI
C
Chung‐Hsing Yeh *
DOI:10.1016/S0305-0548(96)00035-4delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Job oriented scheduling (JOS) has been the most commonly used technique in actual job shop settings. It loads jobs one by one onto machines, in which all the operations of a job are scheduled in succession. This article presents a JOS model and formulates a fast finite loading procedure which is the key algorithm of computer-based JOS systems. The algorithm assigns feasible schedule start and finish times to the operations of a job by loading them forward or backward onto the capacity constrained parallel machines. A particular technique is the maintenance of blocks of consecutively scheduled operations on each machine, thereby reducing the search time for finding a feasible time slot for each operation on the corresponding machine. Experimental testing shows that the algorithm has significant computational performance for large size problems. Copyright (C) 1997 Elsevier Science Ltd
Keywords:
RULES
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

C
Computers and Operations Research
IF:
4.3
Papers:
6.5K
Citations:
1.8W

Organization

No organization information available
Cited Papers

Cited Papers

err
IF0
err
err0
PREAI
err
errShare
errSave
Geological history and within‐island diversity: a debris avalanche and the Tenerife lizard Gallotia galloti
err2006-09-20
err0
PREAI
errRICHARD P. BROWN; PAUL A. HOSKISSON; JOHN‐HENRY WELTON; MARCOS BÁEZ
errShare
errSave
errShare
errSave
Enhanced sodium appetite in rats with lesions centered on nucleus medianus.
err1986-01-01
err0
PREAI
errThomas W. Gardiner; Jeff R. Jolley; Anthony H. Vagnucci; Edward M. Stricker
errShare
errSave
Tensile properties and flow behavior analysis of modified 9Cr–1Mo steel clad tube material
err2014-11-01
err0
PREAI
errKanwarjeet Singh; S. Latha; M. Nandagopal; M.D. Mathew; K. Laha; T. Jayakumar
errShare
errSave
no more