arrow
Return

A fast technique for unit commitment problem by extended priority list

delete2003-05-01
delete346
PRE
AI
T
Tomonobu Senjyu
S
Shimabukuro, K
U
Uezato, K
T
Toshihisa Funabashi
DOI:10.1109/TPWRS.2003.811000delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper introduces. a new unit commitment problem, adapting extended priority fist (EPL) method. The EPL method consists of two steps, in the first step we get rapidly. some initial unit commitment problem schedules by priority list (PL) method. At this step, operational constraints are disregarded. In the second step unit schedule is modified using the problem specific heuristics to fulfill operational constraints. To calculate efficiently, however, note that some heuristics applied only to solutions can expect improvement. Several numerical exam pies demonstrate the effectiveness of proposed method.
Keywords:
heat rate
power system operation and planning
priority list
priority order
unit commitment
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Power Systems cover
IEEE Transactions on Power Systems
IF:
7.2
Papers:
1.1W
Citations:
5.0W

Organization

No organization information available
Cited Papers

Cited Papers

errShare
errSave
A genetic algorithm solution to the unit commitment problem
err1996-01-01
err944
PREAI
errKazarlis, SA; Bakirtzis, AG; Petridis, V
errShare
errSave
A tool for assessing the feasibility of comparative effectiveness research
err2013-01-01
err0
errOAAI
errAlexander Walker; Patrick; Lauer; Hornbrook; Marin; Platt; Roger; Stang; Schneeweiss
errShare
errSave
Short-term resource scheduling with ramp constraints
err1997-01-01
err114
PREAI
errSvoboda, AJ; Tseng, CL; Li, CA; Johnson, RB
errShare
errSave
no more