A genetic algorithm for the resource constrained multi-project scheduling problem
DOI:10.1016/j.ejor.2006.06.074.png)
Abstract
En 中文
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm. (C) 2007 Published by Elsevier B.V.
Keywords:
project management
metaheuristics
genetic algorithm
scheduling