Abstract

Abstract

En 中文
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm. (C) 2007 Published by Elsevier B.V.
Keywords:
project management
metaheuristics
genetic algorithm
scheduling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

I
instituto politecnico do porto
Scholars:
2.8K
Papers: 2.7K
Citations: 2
U
Universidade do Porto
Scholars:
3.0W
Papers: 2.9W
Citations: 34
A
AT&T
Scholars:
811
Papers: 717
Citations: 460
researcher View more organizations