A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems

delete2019-07-02
delete22
PRE
AI
F
Fuqing Zhao *
X
Xuan He
Y
Yi Zhang
W
Wenchang Lei
W
Weimin Ma
C
Chuck Zhang
H
Houbin Song
DOI:10.1007/s10489-019-01497-2delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The no-wait flow shop scheduling problem (NWFSP), as a typical NP-hard problem, has important ramifications in the modern industry. In this paper, a jigsaw puzzle inspired heuristic (JPA) is proposed for solving NWFSP with the objective of minimizing makespan. The core idea behind JPA is to find the best match for each job until all the jobs are scheduled in the set of process. In JPA, a waiting time matrix is constructed to measure the gap between two jobs. Then, a matching matrix based on the waiting time matrix is obtained. Finally, the optimal scheduling sequence is built by using the matching matrix. Experimental results on large-scale benchmark instances show that JPA is superior to the state-of-the-art heuristics.
Keywords:
No-wait flow shop scheduling
Makespan
Heuristic algorithm
Jigsaw puzzle
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Applied Intelligence cover
Applied Intelligence
IF:
3.5
Papers:
7.5K
Citations:
1.7W

Organization

G
Georgia Institute of Technology
Scholars:
1.8W
Papers: 1.4W
Citations: 5.9W
U
university system of georgia
Scholars:
7.3W
Papers: 6.5W
Citations: 101
T
tongji university
Scholars:
7.8W
Papers: 5.9W
Citations: 98
L
lanzhou university of technology
Scholars:
1.2W
Papers: 7.0K
Citations: 4
researcher View more organizations