arrow
Return

A model for parallel machine replacement with capacity expansion

delete2000-03-01
delete54
PRE
AI
S
Suresh Chand
T
Tim McClurg *
J
Jim Ward
DOI:10.1016/S0377-2217(99)00052-1delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper considers an environment where several identical machines are used to meet product/service demands. It is assumed that the product/service demand is growing over time and therefore new machines will be purchased for capacity expansion. Also, older machines are assumed to be more expensive to operate than newer machines; and at some time, it may be economical to replace older machines by newer ones. There may be economies of scale in purchase of new machines. This paper develops an integrated model to find an optimal purchase schedule of new machines to meet both the capacity expansion and the machines replacement requirements. An optimal algorithm and an effective heuristic are developed. Our computational results show that the heuristic is close to optimal. (C) 2000 Published by Elsevier Science B.V. All rights reserved.
Keywords:
equipment replacement
capacity expansion
heuristic procedures
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

No organization information available