Abstract

Abstract

En 中文
This paper presents a risk-based methodology to estimate optimal inspection & maintenance intervals which maximize a system's availability. The methodology is comprised of two steps: availability modeling, and risk-based inspection & maintenance calculations. The methodology is easy to apply, and needs readily available data. The approach can be further improved by including an updating scheme based on the results of previous inspections. The proposed methodology is applied to the steam generating system of an oil tired thermal power plant. The results of the availability analysis are discussed here.
Keywords:
power plant
risk-based approach
risk-based inspection & maintenance

Journal

IEEE Transactions on Reliability cover
IEEE Transactions on Reliability
IF:
5.7
Papers:
2.8K
Citations:
8.5K

Organization

M
Memorial University Newfoundland
Scholars:
8.0K
Papers: 7.8K
Citations: 64
Cited Papers

Cited Papers

Risk-based inspection and maintenance systems for steam turbines
err2004-10-01
err52
PREAI
errFujiyama, K; Nagai, S; Akikuni, Y; Fujiwara, T; Furuya, K; Matsumoto, S; Takagi, K; Kawabata, T
errShare
errSave
no more