arrow
Return

A non-zero integer non-linear programming model for maintenance workforce sizing

delete2014-04-01
delete21
PRE
AI
D
Desmond Eseoghene Ighravwe
S
Sunday Ayoola Oke *
DOI:10.1016/j.ijpe.2014.01.004delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper formulates a non-linear integer programming model to solve a maintenance workforce sizing problem with a productivity improvement goal. This problem is modelled in a bi-objective framework that minimises the number of maintenance personnel while maximising their productivity levels. Inputs into the optimisation model include monthly and routine maintenance periods, volume of production, contingency maintenance time, use factor and priority factor among others. The model has been validated with real-life detergent factory data, demonstrating its potential usefulness. A principal novelty of the model is the inclusion of use factor, which captures how often maintenance technicians are busy on the job with respect to assigned tasks, including unanticipated high maintenance workload. The model has been solved using a branch and bound algorithm. The impact of workforce structure and workers' salaries on model's performance has been studied and sensitivity analysis carried out to investigate the changes to the optimal solution as a result of changes in the input data. The results show a reduction in the number of maintenance workforce personnel in comparing values with and without use factor in the model. The model's ability to obtain global optimal result depends on the value of the minimum routine maintenance time within each maintenance section. Also, the model is shown to be sensitive to priority factor, which captures the appropriate ratio of full- and part-time workers under the same category. The model provides both an easy-to-use practical tool for maintenance managers and supervisors as well as a scientific tool for determining optimal maintenance workforce size for a manufacturing plant. (C) 2014 Elsevier B.V. All rights reserved.
Keywords:
Maintenance workforce
Productivity
Goal programming
Use factor
Priority factor
Routine maintenance
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Economics cover
International Journal of Production Economics
IF:
10
Papers:
8.0K
Citations:
3.6W

Organization

U
University of Lagos
Scholars:
2.3K
Papers: 1.5K
Citations: 1.3K
Cited Papers

Cited Papers

errShare
errSave
A Platform for Manufacturable Stretchable Micro-electrode Arrays
err2012-01-01
err0
errOAAI
errS. Khoshfetrat Pakazad; A. Savov; S.R. Braam; R. Dekker
errShare
errSave
A Multicenter Study to Validate the Reproducibility of MSI Testing With a Panel of 5 Quasimonomorphic Mononucleotide Repeats
err2010-12-01
err0
PREAI
errErmanno Nardon; Damjan Glavač; Jean Benhattar; Patricia J.T.A. Groenen; Gerald Höfler; Heinz Höfler; Andreas Jung; Gisela Keller; Thomas Kirchner; Francesca Lessi; Marjolijn J.L. Ligtenberg; Chiara Maria Mazzanti; Gerlinde Winter; Giorgio Stanta
errShare
errSave
Effect of electromyostimulation training on soleus and gastrocnemii H- and T-reflex properties
err2003-11-01
err0
PREAI
errNicola A. Maffiuletti; Manuela Pensini; Gil Scaglioni; Alessandra Ferri; Yves Ballay; Alain Martin
errShare
errSave
Longitudinal electron bunch profile diagnostics at 45 MeV using coherent Smith-Purcell radiation
err2006-09-11
err0
errOAAI
errG. Doucas; V. Blackmore; B. Ottewell; C. Perry; P. G. Huggard; E. Castro-Camus; M. B. Johnston; J. Lloyd-Hughes; M. F. Kimmitt; B. Redlich; A. van der Meer
errShare
errSave
researcher View more