Return
A note to: A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem
DOI:10.1007/s10845-020-01632-8.png)
Abstract
En 中文
Some of the solutions reported in a recent paper (Akyol and Baykasoglu in J Intell Manuf 30(2):557-573, 2019.) are infeasible, jeopardising the conclusion that best results for the 75% of the 320 test instances for the ALWABP-2 were obtained. In this note, we explore the contributions of the paper, show that some of the solutions are indeed infeasible and point out possible inconsistencies in the employed heuristic that may be causing this issue.
Keywords:
Assembly line balancing
Worker assignment
Mixed integer linear programming
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
7.4
Papers:
3.5K
Citations:
1.1W

