A study of pilot Sludge Treatment Reed Beds for the dewatering of surplus activated sludge from a winery wastewater treatment plant

delete2026-06-10
delete0
delete
OA
AI
R
Riccardo Bresciani
N
Nicola Martinuzzi
A
Anacleto Rizzo
F
Fabio Masi
A
Alexandros Stefanakis *
DOI:10.1016/j.ecoleng.2026.108055delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
• Dewatering of winery wastewater sludge tested in sludge treatment reed beds for the time. • Two sludge loading rates evaluated in pilot-scale reed bed systems. • Sludge dewatering efficiency exceeded 99%. • Optimal loading/resting regime identified at 3 days/1–2 weeks. • Final biosolids complied with standards for agricultural reuse.
Keywords:
Sludge drying reed beds
Sludge dewatering
Sludge volume reduction
Drained water
Heavy metals
Winery wastewater
Biosolids
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Ecological Engineering cover
Ecological Engineering
IF:
4.1
Papers:
6.9K
Citations:
2.2W

Organization

T
technical university of crete
Scholars:
222
Papers: 112
Citations: 0
I
iridra srl
Scholars:
16
Papers: 8
Citations: 0
Cited Papers

Cited Papers

Citing Papers

Citing Papers