Return
An activity-list-based nested partitions algorithm for resource-constrained project scheduling
DOI:10.1080/00207543.2015.1065353.png)
Abstract
En 中文
The resource-constrained project scheduling problem (RCPSP) has received wide attention. In this paper, an activity-list-based nested partitions algorithm (ALNP) is developed for solving the RCPSP and a P-ALNP is proposed to improve ALNP with local adjustment. In the algorithms, to improve the search efficiency, a partial double justification is employed as local search mechanism. The computational experiments on the PSPLIB and analysis on robustness of the algorithms show that ALNP outperforms the traditional serial scheduling scheme for solving the large-scale, complex RCPSPs, and P-ALNP can improve ALNP and obtain better results. P-ALNP is a competitive algorithm for solving the RCPSP.
Keywords:
resource-constrained project scheduling
nested partitions
activity list
serial scheduling scheme
double justification
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
7.3
Papers:
1.1W
Citations:
3.7W

