An Effective Iterated Greedy Algorithm for a Robust Distributed Permutation Flowshop Problem With Carryover Sequence-Dependent Setup Time

delete2022-09-01
delete30
PRE
AI
X
Xue-Lei Jing
潘
潘全科 (Quan-Ke Pan) *
Gao Liang cover
Gao Liang (Liang Gao)
王玲 cover
王玲 (Ling Wang)
DOI:10.1109/TSMC.2021.3131849delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
A new scheduling problem, the distributed permutation flowshop scheduling problem with uncertain processing times and carryover sequence-dependent setup time (DPUC), is addressed. The DPUC is an important application problem in modern electronics manufacturing. A robust model is established for the DPUC with makespan criterion. A counter-intuitive paradox is found, that is, adding a new job to one of the production lines can reduce the completion time of the production line. Two acceleration methods are provided to save computational efforts. An iterated greedy algorithm called IG_FS is proposed to solve the DPUC. A heuristic based on the well-known NEH is proposed to generate the initial solution for the IG_FS. In the destruction phase of the IG_FS, dynamic sizes based on both adaptability and randomness are provided to improve the exploration capability. During the local search phase of the IG_FS, a hybrid local search method consisting of shift and swap operators is presented to exploit more diverse search areas. Extensive experiments show that the proposed IG_FS performs significantly better than the six competing algorithms adapted from the closely related scheduling literature.
Keywords:
Production
Job shop scheduling
Uncertainty
Single machine scheduling
Automation
Search methods
Optimization
Carryover sequence-dependent setup time (CST)
iterated greedy (IG) algorithm
scheduling
uncertain processing times (UPT)

Journal

IEEE Transactions on Cybernetics cover
IEEE Transactions on Cybernetics
IF:
10.5
Papers:
1.1W
Citations:
5.0W

Organization

T
tsinghua university
Scholars:
11.9W
Papers: 10.0W
Citations: 137
S
shanghai university
Scholars:
3.9W
Papers: 2.7W
Citations: 52
Cited Papers

Cited Papers

A Review on Swarm Intelligence and Evolutionary Algorithms for Solving Flexible Job Shop Scheduling Problems
err2019-07-01
err371
errOAAI
errGao, Kaizhou; Cao, Zhiguang; Zhang, Le; Chen, Zhenghua; Han, Yuyan; Pan, Quanke
errShare
errSave
Fabrication of an Electromagnetic Micropump for Cerebrospinal Fluid Shunt
err2021-11-10
err0
PREAI
errMyung Sik Kim; Kee Young Kwon; Sang Wook Lee; Sang Sik Yang
errShare
errSave
errShare
errSave
researcher View more