Abstract

Abstract

En 中文
To solve the resource-constrained project-scheduling problem (RCPSP) with ordinal interval numbers, this paper presents an effective teaching-learning-based optimisation (TLBO) algorithm. Ordinal interval number is introduced as a novel tool for handling vague information to describe the RCPSP under uncertain environment. An ordinal interval-based parallel schedule generation scheme is used to generate feasible schedules. Two new phases including the self-study phase and the exam phase are incorporated into the TLBO to enhance the teaching-learning process. In the self-study phase, the population is updated by a mutation operator to prevent premature convergence and to enhance exploration search. In the exam phase, elite students are selected to enhance exploitation search. Moreover, a novel ordinal interval resource-based crossover operator (OIRBCO) is well designed for both the teacher phase and the student phase of the TLBO. Computational comparisons between the OIRBCO and the existing two-point crossover show that OIRBCO is more effective due to the utilisation of the resource information. In addition, statistical comparisons with particle swarm optimisation and simulated annealing show that the proposed TLBO is more effective in solving the RCPSP with ordinal interval numbers.
Keywords:
teaching-learning-based optimisation
ordinal interval resource-based crossover
self-study phase
ordinal interval number
exam phase
Resource-constrained project scheduling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Research cover
International Journal of Production Research
IF:
7.3
Papers:
1.1W
Citations:
3.7W

Organization

T
tsinghua university
Scholars:
11.9W
Papers: 10.0W
Citations: 137
Cited Papers

Cited Papers

IFSJSP: A novel methodology for the Job-Shop Scheduling Problem based on intuitionistic fuzzy sets
err2013-09-01
err34
PREAI
errZhang, Xiaoge; Deng, Yong; Chan, Felix T. S.; Xu, Peida; Mahadevan, Sankaran; Hu, Yong
errShare
errSave
errShare
errSave
CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
errShare
errSave
researcher View more