An iterated greedy algorithm for the parallel blocking flow shop scheduling problem and sequence-dependent setup times

delete2021-12-01
delete29
delete
OA
AI
I
Imma Ribas *
X
Xavier Tort‐Martorell
DOI:10.1016/j.eswa.2021.115535delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
This paper deals with the problem of scheduling jobs in a parallel flow shop configuration under the blocking constraint, in which the setup time of machines depends not only on the job to be processed but also on the previously processed one, i.e., there are sequence-dependent setup times. The performance analysis of several iterated greedy algorithms with different initial solution procedures and local searches lets us define an efficient algorithm to minimize the maximum job completion time. Moreover, the computational evaluation showed the efficiency of searching in different neighborhood structures and noted the significant influence of the initial solution. However, contrary to other scheduling problems, starting with a high quality solution does not guarantee better performance of the algorithm.
Keywords:
Parallel Flow Shop
Sequence-dependent Setup times
Makespan
Distributed Flow Shop
Blocking
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Expert Systems with Applications cover
Expert Systems with Applications
IF:
7.5
Papers:
3.0W
Citations:
10.2W

Organization

U
universitat politecnica de catalunya
Scholars:
1.9W
Papers: 1.6W
Citations: 17
Cited Papers

Cited Papers

Traumatic Venous Aneurysm
err1987-04-01
err0
PREAI
errHORMOZAN APRIN; GARY B. SCHWARTZ; ELSA VALDERAMMA
errShare
errSave
errShare
errSave
errShare
errSave
researcher View more