arrow
Return

An optimal replacement policy for complex multi-component systems

delete2016-04-11
delete13
PRE
AI
R
Reza Ahmadi *
DOI:10.1080/00207543.2016.1173252delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Given a reward structure, this paper addresses an optimal replacement problem for complex multi-component systems. To maintain revenue stream resulting from system, the system is inspected according to a homogeneous Poisson process and certain actions are carried out in response to the system state. Decisions are based on a performance measure described by a Squared Bessel process. Given some assumption, we explore the inherent relation between the Squared Bessel process and an extended Gamma (EG) process. Since there are some flow of income and increasing costs due to inspections, the problem is to optimally stop processing the system and carrying out a renewal to maximize the reward functional. To this end, using the local characteristics of the EG process as a stopping criterion and the expected total discounted reward as a measure of policy, this paper aims at determining an optimal operating (stopping) time which truly balances both income and cost and so maximizes the expected discounted reward over a cycle. In support of the model a numerical example is provided to show feasibility of this programme in real application. Attention is restricted to perfect repair and inspection, but the paper provides the structure so that different scenarios can be explored.
Keywords:
Replacement
inspection
complex multi-component system
Wiener process
extended gamma process
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Research cover
International Journal of Production Research
IF:
7.3
Papers:
1.1W
Citations:
3.7W

Organization

No organization information available