arrow
Return

An optimization-based approach for design project scheduling

delete2008-07-01
delete8
PRE
AI
M
Ming Ni *
P
Peter B. Luh
B
Bryan Moser
DOI:10.1109/TASE.2008.916928delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Concurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design task often depends on the knowledge about other tasks and requires effective communication, tasks and communication activities need to be properly coordinated to avoid delays caused by waiting for information or the need for rework. This paper presents a novel formulation for design project scheduling with explicit modeling of task dependencies and the associated communication activities. General dependencies are modeled as combinations of three basic types representing sequential, concurrent, and independent processes. Communication activities are also modeled as tasks, and their interactions with design tasks are described by sets of intertask constraints. The objective is to achieve timely project completion with limited resources. To improve algorithm convergence and schedule quality, penalties on the violation of constraints coupling design tasks are added to the objective function. A solution methodology that combines Lagrangian relaxation, dynamic programming, and heuristic is developed to schedule design and communication tasks, and a surrogate optimization framework is used to overcome the inseperability caused by nonadditive penalties. A heuristic procedure is then developed to obtain scheduling policies from optimization results and to dynamically construct schedules. Numerical results show that the approach is effective to handle various task dependencies and the associated communication activities to provide high-quality schedules. Note to Practitioners - A short product design cycle is critical for manufacturers to succeed in the era of time-based competition. To speed up the design process, concurrent engineering has been widely used where multiple design tasks are concurrently performed. As a design task can be performed with preliminary or partial information on other tasks and the information may be updated, effective communication is required. If design and communication activities are not properly coordinated, the project may be significantly delayed by waiting for information or by the need for rework. This paper presents a novel formulation for design project scheduling by appropriately modeling task dependencies and the associated communication activities. A solution methodology based on decomposition and coordination is developed to schedule both design and communication tasks to achieve timely project completion. Numerical results show that the approach is effective to handle various task dependencies and the associated communication activities to provide high-quality schedules.
Keywords:
concurrent engineering
design project scheduling
Lagrangian relaxation
surrogate optimization
task dependency and communication activities
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Automation Science and Engineering cover
IEEE Transactions on Automation Science and Engineering
IF:
6.4
Papers:
5.1K
Citations:
1.6W

Organization

U
University of Connecticut
Scholars:
2.4W
Papers: 2.2W
Citations: 2.5W
Cited Papers

Cited Papers

HIV/STD Stigmatization Fears as Health-Seeking Barriers in China
err2005-12-23
err0
errOAAI
errEli Lieber; Li Li; Zunyou Wu; Mary Jane Rotheram-Borus; Jihui Guan
errShare
errSave
err
IF0
err
err0
PREAI
err
errShare
errSave
The Influence of the Dies Geometry on the Drawing Force for Steel Wires
err2017-01-01
err0
errOAAI
errMarius Tintelecan; Ioana Monica Sas-Boca; Dana-Adriana Iluţiu-Varvara
errShare
errSave
CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
errShare
errSave
researcher View more