Return
An uncertain multi-objective programming model for machine scheduling problem
DOI:10.1007/s13042-016-0522-2.png)
Abstract
En 中文
This paper discusses a parallel machine scheduling problem in which the processing times of jobs and the release dates are independent uncertain variables with known uncertainty distributions. An uncertain programming model with multiple objectives is obtained, whose first objective is to minimize the maximum completion time or makespan, and second objective is to minimize the maximum tardiness time. A genetic algorithm is employed to solve the proposed uncertain machine scheduling model, and its efficiency is illustrated by some numerical experiments.
Keywords:
Machine scheduling problem
Uncertain variable
Uncertain programming
Genetic algorithm
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
2.7
Papers:
3.2K
Citations:
5.6K
Organization
Cited Papers
Wheat Bread Fortification by Grape Pomace Powder: Nutritional, Technological, Antioxidant, and Sensory Properties
Foods
IF0
Molecular systematics and morphological identification of the cryptic species of the genus Acalles Schoenherr, 1825, with descriptions of new species (Coleoptera: Curculionidae: Cryptorhynchinae)
Zootaxa
IF0

