Abstract
En 中文
In this paper. a new approach on traditional assembly line balancing problem is presented. The goal of proposed approach is to establish balance of the assembly line with minimum number of station and resources. For this purpose, 0-1 integer-programming models are developed. These models are solved using GAMS-CPLEX mathematical programming software for a numerical example. (c) 2004 Elsevier B.V. All rights reserved.
Keywords:
assembly line balancing
resource constraint
0-1 integer programming
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
10
Papers:
7.9K
Citations:
3.6W