arrow
Return

Balancing stochastic two-sided assembly lines

delete2015-04-07
delete32
PRE
AI
W
Wen‐Chyuan Chiang
T
Timothy L. Urban *
罗春泳 (Chunyong Luo)
DOI:10.1080/00207543.2015.1029084delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
In a two-sided assembly line, tasks can be executed simultaneously on both sides of the line. One task cannot be started until both of its direct predecessors on the left and right sides are completed. Therefore, the start time of the task is the maximum of the two predecessors' finish times. In many realistic situations, it is assumed that the task times are independent and normally distributed with known means and variances. However, the maximum of two normal variables is not normally distributed, but can be well approximated by results from extreme value theory. In this paper, we utilise these results to develop a solution methodology to balance two-sided assembly lines with stochastic task times, minimising the line length and the number of stations while guaranteeing all tasks are completed within the cycle time with a given confidence level.
Keywords:
manufacturing
two-sided assembly line
stochastic task time
particle swarm optimization
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Research cover
International Journal of Production Research
IF:
7.3
Papers:
1.1W
Citations:
3.7W

Organization

U
University of Tulsa
Scholars:
1.6K
Papers: 1.4K
Citations: 1.6K