BIM framework for efficient material procurement planning

delete2024-12-01
delete0
PRE
AI
M
Mohammadreza Kalantari
H
Hosein Taghaddos *
H
Heydari, Mohammadhossein
DOI:10.1016/j.autcon.2024.105803delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Inefficient procurement processes can lead to increased costs and project delays. Addressing information management inefficiencies is a significant but largely unexplored area within construction procurement strategies, despite potential for automation through Database Management Systems (DBMS) and Industry Foundation Classes (IFC). Subjective approaches constrain procurement planning, hindering optimal solutions. This paper addresses the gap by developing a comprehensive semi-automated procurement planning framework. The framework offers flexibility through a two-phased optimization employing Particle Swarm Optimization (PSO) or Genetic Algorithm (GA), integrated with a Building Information Modeling (BIM)-driven database platform compatible with various modeling software. It enhances decision-making by considering indirect costs and allowing installment payments while generating a 4D schedule for improved supply chain stakeholder visualization and decision-making (e.g., project managers), demonstrating improvements over traditional procurement plans in a real-world case study. The developed framework enables future research on integrating real-time data, predictive analytics, and smart contracts to further enhance procurement management.
Keywords:
Materials procurement
Material layout scheduling
Construction supply chain management
Construction planning
Procurement planning
4D schedule
Building information modeling (BIM)

Journal

Automation in Construction cover
Automation in Construction
IF:
11.5
Papers:
6.2K
Citations:
4.2W

Organization

U
University of Tehran
Scholars:
2.4W
Papers: 2.3W
Citations: 2.7W