Return
Abstract
En 中文
A new conceptual and analytical vehicle for problems of temporal planning under uncertainty, involving determination of optimal (sequential) stochastic decision rules is defined and illustrated by means of a typical industrial example. The paper presents a method of attack which splits the problem into two non-linear (or linear) programming parts, (i) determining optimal probability distributions, (ii) approximating the optimal distributions as closely as possible by decision rules of prescribed form.
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
No journal information available
Organization
No organization information available
Cited Papers
No cited papers available

