arrow
Return

Cluster Analysis and Model Comparison Using Smart Meter Data

delete2021-05-02
delete24
delete
OA
AI
M
Muhammad Arslan Shaukat *
H
Haafizah Rameeza Shaukat *
Z
Zakria Qadir
H
Hafiz Suliman Munawar
A
Abbas Z. Kouzani
M
M. A. Parvez Mahmud
DOI:10.3390/s21093157delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
Load forecasting plays a crucial role in the world of smart grids. It governs many aspects of the smart grid and smart meter, such as demand response, asset management, investment, and future direction. This paper proposes time-series forecasting for short-term load prediction to unveil the load forecast benefits through different statistical and mathematical models, such as artificial neural networks, auto-regression, and ARIMA. It targets the problem of excessive computational load when dealing with time-series data. It also presents a business case that is used to analyze different clusters to find underlying factors of load consumption and predict the behavior of customers based on different parameters. On evaluating the accuracy of the prediction models, it is observed that ARIMA models with the (P, D, Q) values as (1, 1, 1) were most accurate compared to other values.
Keywords:
smart meter
artificial neural network
ARIMA
smart grid
regression
SGSC
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Sensors cover
Sensors
IF:
3.5
Papers:
7.1W
Citations:
20.9W

Organization

U
university of technology sydney
Scholars:
1.6W
Papers: 2.0W
Citations: 25
W
western sydney university
Scholars:
1.0W
Papers: 1.1W
Citations: 16
D
Deakin University
Scholars:
2.0W
Papers: 2.1W
Citations: 2.8W
researcher View more organizations