arrow
Return

Commercial ATS program management

delete2002-12-01
delete2
PRE
AI
C
Chris Schwarz *
C
C. Pothier
DOI:10.1109/MAES.2002.1145729delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
With the defense industry's ever-increasing reliance on Commercial-Off-The-Shelf (COTS) Automatic Test Systems (ATS) and commercial suppliers, there is a need to recognize and actively manage the gap between the expectations of the defense industry and the commercial community. The key to a successful program has proven to be investing time during the proposal stage and at contract award to clearly define the COTS deliverables and the level of detail of required data. This requires discipline from the supplier (engineering, sales, and the proposal team) as well as the procuring agency to agree that the time investment is worthwhile. This paper examines the problem and outlines proven strategies in managing this gap.
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Aerospace and Electronic Systems Magazine cover
IEEE Aerospace and Electronic Systems Magazine
IF:
3.8
Papers:
2.1K
Citations:
2.5K

Organization

No organization information available
Cited Papers

Cited Papers

No cited papers available