Return
Comparing concurrent and sequential practices in cloud-BIM interdisciplinary collaborative design: an experimental study
DOI:10.1080/17452007.2025.2549493.png)
Abstract
En
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
2.5
Papers:
183
Citations:
1.3K

