arrow
Return

Computer vision-based process time data acquisition for offsite construction

delete2023-05-01
delete11
PRE
AI
F
Fatima Alsakka *
I
Ibrahim El-chami
禹
禹海涛 (Haitao Yu)
M
Mohamed Al‐Hussein
DOI:10.1016/j.autcon.2023.104803delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The application of computer vision in offsite construction for time data acquisition has proven valuable, but current methods pose a significant set-up burden. In the research presented in this paper, a computer vision -based process time data acquisition system (TiDA) for acquiring productivity-related data (productive time, cycle time, and process start-time) at the workstation level in panelized construction without the need for sig-nificant set-up efforts is proposed. The logic of the proposed system is demonstrated in reference to workstations on a wall production line in a lightweight wood panelized construction factory. Moreover, its promising per-formance is described in detail in a case application to framing operations in the factory. The mean absolute errors corresponding to the process start-time, productive time, and cycle time needed to frame 121 panels are found to be 0.72 min, 0.96 min, and 0.77 min per panel, respectively.
Keywords:
Computer vision
Object detection
Offsite construction
Artificial intelligence
Automated measurement
Process time
Productivity

Journal

Automation in Construction cover
Automation in Construction
IF:
11.5
Papers:
6.3K
Citations:
4.2W

Organization

U
University of Alberta
Scholars:
1.3K
Papers: 578
Citations: 0
U
University of British Columbia
Scholars:
1.3K
Papers: 574
Citations: 0
Cited Papers

Cited Papers

Epidemiology and traumatology of injuries in elite soccer: a prospective study in Finland
err2007-01-30
err0
PREAI
errP. Lüthje; I. Nurmi; M. Kataja; E. Belt; P. Helenius; J. P. Kaukonen; H. Kiviluoto; E. Kokko; T. P. Lehtipuu; A. Lehtonen; T. Liukkonen; J. Myllyniemi; P. Rasilainen; E. Tolvanen; H. Virtanen; M. Walldén
errShare
errSave
A vision-based approach for automatic progress tracking of floor paneling in offsite construction facilities
err2021-05-01
err48
errOAAI
errMartinez, Pablo; Barkokebas, Beda; Hamzeh, Farook; Al-Hussein, Mohamed; Ahmad, Rafiq
errShare
errSave
errShare
errSave
errShare
errSave
A vision-based system for pre-inspection of steel frame manufacturing
err2019-01-01
err67
PREAI
errMartinez, Pablo; Ahmad, Rafiq; Al-Hussein, Mohamed
errShare
errSave
researcher View more