Abstract

Abstract

En 中文
This paper presents a mixed-integer linear optimization problem for unit commitment and economic dispatch of power generators in a meshed isolated power system. The optimization problem is referred to as the optimal reserve planning problem (ORPP). The ORPP guarantees that the system frequency is kept above a predefined limit in the event of a contingency. The minimum frequency constraints are formulated using novel sufficient conditions that take into account the system inertia and the dynamics of the power generators. The proposed sufficient conditions are attractive from both a computational and a modelling point of view. We compare the ORPP to a unit commitment problem that only considers the stationary behavior of the frequency. Simulations based on a Faroe Islands case study show that, without being overly conservative, potential blackouts and power outages can be avoided using the ORPP. In the particular case study, the cost increase associated with the additional security provided by the ORPP is less than 3%.
Keywords:
Energy management
power generation planning
optimal scheduling
integer linear programming
islanding
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Power Systems cover
IEEE Transactions on Power Systems
IF:
7.2
Papers:
1.1W
Citations:
5.0W

Organization

O
orsted
Scholars:
118
Papers: 100
Citations: 0
T
technical university of denmark
Scholars:
2.6W
Papers: 2.8W
Citations: 37