arrow
Return

Controversial cycle lanes: lessons from Cycleway C9, Chiswick High Road

delete2025-09-09
delete0
delete
OA
AI
Y
Yonat Rein‐Sapir *
R
Robin Hickman *
DOI:10.1080/1523908X.2025.2554231delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Implementing cycle projects often encounters significant challenges. This paper examines the planning and implementation of Cycleway C9 in Chiswick, west London. In-depth interviews and thematic and discursive analysis are used to examine the different viewpoints from the proponents of the project (transport planners), relative to those experiencing the project (politicians, local businesses and residents), in support and opposition. There are strong contestations over the use of streetspace, analysed through key themes concerning: scheme objectives, local versus strategic role, streets for whom, space design, politics, participation, funding, adapting to change and impacts and evaluation. Mediating such subjectivities is critical to the successful implementation of cycle projects, requiring a much stronger participatory and deliberative approach to transport planning.
Keywords:
Cycling
street-space
streets for whom
politics
participation

Journal

Journal of Environmental Policy and Planning cover
Journal of Environmental Policy and Planning
IF:
2.2
Papers:
677
Citations:
2.3K

Organization

U
University College London
Scholars:
7.9W
Papers: 6.2W
Citations: 15.7W
T
the hebrew university
Scholars:
166
Papers: 75
Citations: 0