Decomposition algorithm for large-scale two-stage unit-commitment

delete2015-10-05
delete25
delete
OA
AI
W
Wim van Ackooij *
J
Jérôme Malick
DOI:10.1007/s10479-015-2029-8delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Everyday, electricity generation companies submit a generation schedule to the grid operator for the coming day; computing an optimal schedule is called the unit-commitment problem. Generation companies can also occasionally submit changes to the schedule, that can be seen as intra-daily incomplete recourse actions. In this paper, we propose a two-stage formulation of unit-commitment, wherein both the first and second stage problems are full unit-commitment problems. We present a primal-dual decomposition approach to tackle large-scale instances of these two-stage problems. The algorithm makes extensive use of warm-started bundle algorithms, and requires no specific knowledge of the underlying technical constraints. We provide an analysis of the theoretical properties of the algorithm, as well as computational experiments showing the interest of the approach for real-life large-scale unit-commitment instances.
Keywords:
Two-stage integer programming
Stochastic unit-commitment
Price decomposition
Convex duality
Nonsmooth optimization
Bundle methods

Journal

Annals of Operations Research cover
Annals of Operations Research
IF:
4.5
Papers:
8.0K
Citations:
2.1W

Organization

E
electricite de france (edf)
Scholars:
1.2K
Papers: 898
Citations: 0
C
centre national de la recherche scientifique (cnrs)
Scholars:
24.5W
Papers: 18.2W
Citations: 279