arrow
Return

Delay Analysis in Full-Duplex Heterogeneous Cellular Networks

delete2019-10-01
delete13
delete
OA
AI
L
Leila Marandi
M
Mansour Naslcheraghi
S
Seyed Ali Ghorashi *
M
Mohammad Shikh‐Bahaei
DOI:10.1109/TVT.2019.2932191delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
Heterogeneous networks (HetNets) as a combination of macro cells and small cells are used to increase the cellular networks capacity, and present a perfect solution for high-speed communications. Increasing area spectrum efficiency and capacity of HetNets largely depends on the high speed of backhaul links. One effective way that is currently utilized in HetNets is the use of full-duplex (FD) technology that potentially doubles the spectral efficiency without the need for additional spectrum. On the other hand, one of the most critical network design requirements is delay, which is a key representation of the quality of service in modern cellular networks. In this paper, by utilizing tools from the stochastic geometry, we analyze the local delay for downlink channel, which is typically defined as the mean number of required time slots for a successful communication. Given imperfect self-interference cancellation in practical FD communications, we utilize duplex mode (half-duplex (HD) or FD) for each user based on the distance from its serving base station. Further, we aim to investigate the energy efficiency for both duplexing modes, i.e., HD and FD, by considering local delay. We conduct extensive simulations to validate system performance in terms of local delay versus different system key parameters.
Keywords:
Delays
Interference
Geometry
Receivers
Quality of service
Tools
Cellular networks
Heterogeneous networks
full duplex
half duplex
local delay
stochastic geometry
energy efficiency
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Vehicular Technology cover
IEEE Transactions on Vehicular Technology
IF:
7.1
Papers:
1.8W
Citations:
6.6W

Organization

S
Shahid Beheshti University
Scholars:
7.6K
Papers: 6.8K
Citations: 6.9K
U
universite de montreal
Scholars:
4.6W
Papers: 3.8W
Citations: 46
P
Polytechnique Montreal
Scholars:
3.7K
Papers: 3.4K
Citations: 42
researcher View more organizations