Developing a Cost Overrun Predictive Model for Complex Systems Development Projects

delete2015-12-01
delete18
delete
OA
AI
M
Moses T. Adoko *
T
Thomas A. Mazzuchi
S
Shahram Sarkani
DOI:10.1002/pmj.21545delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
While system complexity is on the rise across many product lines, the resources required to successfully design and implement complex systems remain constrained. Because financiers of complex systems development efforts actively monitor project implementation cost, project performance models are needed to help project managers predict their cost compliance and avoid cost over-runs. This article describes recent research conducted by the authors to develop a cost overrun predictive model using five known drivers of complex systems development cost. The study identifies schedule and reliability, as the key determinants of whether or not a large complex systems development project will experience cost overrun.
Keywords:
project performance
predictive model
systems engineering
schedule cost
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Project Management cover
International Journal of Project Management
IF:
7.5
Papers:
2.6K
Citations:
1.2W

Organization

G
George Washington University
Scholars:
1.6W
Papers: 1.4W
Citations: 1.7W