arrow
Return

Drawdowns

delete2020-08-31
delete0
PRE
AI
DOI:10.3905/jpm.2020.1.170delete
deleteOriginal
deleteShare
deleteSave
Abstract

Abstract

En
errShare
errSave
Portfolio selection with a drawdown constraint
err2006-11-01
err47
PREAI
errAlexander, Gordon J.; Baptista, Alexandre M.
errShare
errSave
errShare
errSave
Rapid Drawdown Analysis of Levees
err2025-01-01
err0
PREAI
errTurkson, Prince; Vandenberge, Daniel R.
errShare
errSave
Technical Challenges of Safety Emergency Drawdown for High Dam and Large Reservoir Project
err2023-04-14
err3
errOAAI
errZheng, Xueyu; Zhang, Luchen; Yang, Jiaxiu; Du, Shuaiqun; Wu, Shiqiang; Luo, Shaoze
errShare
errSave
Capital Asset Pricing Model (CAPM) with drawdown measure
err2014-04-01
err54
PREAI
errZabarankin, Michael; Pavlikov, Konstantin; Uryasev, Stan
errShare
errSave
Implementing and testing the Maximum Drawdown at Risk
err2017-08-01
err17
PREAI
errde Melo Mendes, Beatriz Vaz; Lavrado, Rafael Coelho
errShare
errSave
Study on Threshold Values of Safety Control Indicators for Rapid Drawdown of 200~300 m High Earth-Rockfill Dams
err2026-09-15
err0
errOAAI
errXueyu Zheng; Luchen Zhang; Jiaxiu Yang; Bin Lu; Hezuo Zhang; Lei Yu; Ruilin Cheng; Wei Sun; Chuang Liu; Yuan Liu
errShare
errSave

Journal

No journal information available

Organization

No organization information available
Cited Papers

Cited Papers

No cited papers available