arrow
Return

Ensuring Physically Realizable Storage Operation in the Unit Commitment Problem

delete2022-11-01
delete5
delete
OA
AI
J
José M. Arroyo *
DOI:10.1109/TPWRS.2022.3193035delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
A linear and convex model has been recently presented for the operation of battery energy storage units that does not explicitly prevent their simultaneous charge and discharge in the problem formulation. This letter claims that the model in such a literature contribution is capable of ensuring the physical realizability of the battery dispatch only when nondiscrete decisions are considered in the optimization problem. This claim is demonstrated through the solution of two instances of a simple unit-commitment-based example comprising two generating units, one battery energy storage unit, and two time periods.
Keywords:
Batteries
Costs
Optimization
Generators
Discharges (electric)
Mathematical models
Computational modeling
Battery energy storage units
electrical energy storage
physically realizable dispatch
simultaneous charge and discharge
unit commitment

Journal

IEEE Transactions on Power Systems cover
IEEE Transactions on Power Systems
IF:
7.2
Papers:
1.1W
Citations:
5.0W

Organization

U
Universidad de Castilla-La Mancha
Scholars:
9.9K
Papers: 9.1K
Citations: 7