Estimating performance time for construction projects

delete2007-10-01
delete64
PRE
AI
G
Greg J. Hoffman *
A
Alfred E. Thal
T
Timothy Webb
J
Jeffery D. Weir
DOI:10.1061/(ASCE)0742-597X(2007)23:4(193)delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The prediction of performance time for construction projects is a problem of interest to both researchers and practitioners. This research seeks to gain insight into the significant factors impacting construction duration by developing a regression model. Data were collected for 856 facility projects completed between 1988 and 2004. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. The multiple linear regression model was found to provide the most acceptable prediction. As in the BTC model and previous research reported in the literature, a significant correlation was found to exist between cost and duration. However, several other factors were also identified that resulted in significantly lower than average construction durations. These include projects completed within certain management groupings, managed by a certain construction agent, and designed by in-house personnel.
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Management in Engineering
IF:
7
Papers:
3.1K
Citations:
6.8K

Organization

No organization information available
Cited Papers

Cited Papers

errShare
errSave
errShare
errSave
no more