Exact algorithms for the feedback length minimisation problem

delete2018-04-24
delete6
PRE
AI
Z
Zhen Shang
S
Songzheng Zhao
Y
Yanjun Qian *
林军 cover
林军 (Jun Lin)
DOI:10.1080/00207543.2018.1456697delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Planning the sequence of interrelated activities of production and manufacturing systems has become a challenging issue due to the existence of cyclic information flows. This study develops efficient exact algorithms for finding an activity sequence with minimum total feedback length in a design structure matrix. First, we present two new properties of the problem. Second, based on the properties, we develop an efficient Parallel Branch-and-Prune algorithm (PBP). Finally, the proposed PBP is further improved by adopting hash functions representing activity sequences, which is referred as hash function-based PBP. Experimental results indicate that the proposed hash function-based PBP can find optimal solutions for problems up to 25 interrelated activities within 1 h, and outperforms existing methods.
Keywords:
design structure matrix
production and manufacturing system
iterative process
Branch-and-Prune Algorithm
hash function
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

International Journal of Production Research cover
International Journal of Production Research
IF:
7.3
Papers:
1.1W
Citations:
3.7W

Organization

X
xi'an jiaotong university
Scholars:
9.2W
Papers: 6.6W
Citations: 75
N
Northwestern Polytechnical University
Scholars:
4.6W
Papers: 3.7W
Citations: 5.3W