Exact lexicographic scheduling and approximate rescheduling
DOI:10.1016/j.ejor.2020.08.032.png)
Abstract
En 中文
In industrial resource allocation problems, an initial planning stage may solve a nominal problem instance and a subsequent recovery stage may intervene to repair inefficiencies and infeasibilities due to uncertainty, e.g. machine failures and job processing time variations. In this context, we investigate the minimum makespan scheduling problem, a.k.a. P vertical bar vertical bar C-max, under uncertainty. We propose a two-stage robust scheduling approach where first-stage decisions are computed with exact lexicographic scheduling and second-stage decisions are derived using approximate rescheduling. We explore recovery strategies ac- counting for planning decisions and constrained by limited permitted deviations from the original schedule. Our approach is substantiated analytically, with a price of robustness characterization parameterized by the degree of uncertainty, and numerically. This analysis is based on optimal substructure imposed by lexicographic optimality. Thus, lexicographic optimization enables more efficient rescheduling. Further, we revisit state-of-the-art exact lexicographic optimization methods and propose a lexicographic branchand-bound algorithm whose validated computationally. (C) 2020 Elsevier B.V. All rights reserved.
Keywords:
Scheduling
Lexicographic optimization
Exact MILP methods
Robust optimization
Price of robustness
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
6
Papers:
2.2W
Citations:
6.4W