Return
Flexibility optimization from distributed storage resources under stochastic uncertainties
DOI:10.1016/j.epsr.2025.112674.png)
Abstract
En 中文
• Two-stage method optimizes BESS flexibility in distribution networks. • Day-ahead planning is refined using real-time operation feedback. • Model includes stochastic scenarios for load, PV, and EV variations. • BESS reserve strategy reduces operational mode switching. • Iterative approach balances economic and technical performance.
Journal
IF:
4.2
Papers:
1.1W
Citations:
2.2W

