arrow
Return

Formulating infrastructure restoration as a geospatial multi-project scheduling problem using agent-based simulation

delete2025-10-14
delete0
delete
OA
AI
S
Sihan Cao
W
Wenying Ji
F
Fang Dongping
Z
Zaishang Li *
DOI:10.1016/j.autcon.2025.106595delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
• Post-flood restoration is formulated as geospatial multi-project scheduling prioritizing accessibility. • Agent-based modeling with deep learning enables rapid, scalable restoration of large-scale urban networks. • Interpretable Gantt charts and crew trajectories provide practical decision support tools for emergency managers. • Comparative analysis of restoration strategies offer actionable insights for emergency response.
Keywords:
Infrastructure systems
Road restoration
Scattered repetitive project scheduling
Accessibility
Complex system modeling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Automation in Construction cover
Automation in Construction
IF:
11.5
Papers:
6.2K
Citations:
4.2W

Organization

G
George Mason University
Scholars:
7.7K
Papers: 7.9K
Citations: 1.0W
T
tsinghua university
Scholars:
11.8W
Papers: 10.0W
Citations: 137