Return
Formulating infrastructure restoration as a geospatial multi-project scheduling problem using agent-based simulation
DOI:10.1016/j.autcon.2025.106595.png)
Abstract
En 中文
• Post-flood restoration is formulated as geospatial multi-project scheduling prioritizing accessibility. • Agent-based modeling with deep learning enables rapid, scalable restoration of large-scale urban networks. • Interpretable Gantt charts and crew trajectories provide practical decision support tools for emergency managers. • Comparative analysis of restoration strategies offer actionable insights for emergency response.
Keywords:
Infrastructure systems
Road restoration
Scattered repetitive project scheduling
Accessibility
Complex system modeling
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
11.5
Papers:
6.2K
Citations:
4.2W

