Return
Fuzzy rough bi-level multi-objective nonlinear programming problems
DOI:10.1016/j.aej.2019.12.002.png)
Abstract
En 中文
Fuzzy rough bi-level multi-objective nonlinear programming problem (FRBMNPP) moved toward becoming rise normally in various real applications. In this article we develop bi-level multi-objective nonlinear programming problem (BMNPP), in which the objective functions have fuzzy nature and the constraints represented as a rough set. The fuzzy objective functions converted into deterministic ones by utilizing the alpha-cut methodology. Thus the FRBMNPP become a rough BMNPP which is transformed into two problems corresponding to the upper and lower approximation models. The Karush-Kuhn-Tucker (KKT) method and two models of technique of order preferences by similarity to ideal solution (TOPSIS) approach are developed to solve such problem. At last, applicability and efficiency of the two TOPSIS models and KKT method, suggested in this study, are presented through an algorithm and a numerical illustration. (C) 2019 The Authors. Published by Elsevier B.V. on behalf of Faculty of Engineering, Alexandria University.
Keywords:
Bi-level optimization
Multi-objective programming
Rough set
Fuzzy sets
TOPSIS
Karush-Kuhn-Tucker (KKT) method
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
6.8
Papers:
6.3K
Citations:
2.6W
Organization
Cited Papers
Uptake of the multi-arm multi-stage (MAMS) adaptive platform approach: a trial-registry review of late-phase randomised clinical trials
BMJ Open
IF0
Implant Coating Manufactured by Micro-Arc Oxidation and Dip Coating in Resorbable Polylactide for Antimicrobial Applications in Orthopedics
Coatings
IF0

