Abstract

Abstract

En 中文
The Resource-Constrained Project Scheduling Problem (RCPSP) is a challenging optimization problem. In RCPSPs, it is very common to consider homogeneous activities, which means all activities require all types of resources. In practice, the activities are often singular because they usually require one single resource to execute an activity. The existing algorithms may be used for solving this variant of RCPSPs with a simple modification. However, they are computationally expensive due to unnecessary resource constraints. In this paper, we propose a customised evolutionary algorithm integrated with three heuristics for the singular activities. The first heuristic is based on the earliest start time with an aim to rectify an infeasible schedule. The second heuristic is based on neighbourhood swapping which is used to find the best possible alternatives. The third heuristic is used to further enhance the quality of the schedule. The performance of the proposed framework has been tested by solving a wide range of benchmark problems and the obtained results revealed that the proposed approach outperformed the existing algorithms. In addition, statistical and parametric testing show the value and characteristics of the proposed approach.
Keywords:
Genetic algorithms
Software
Heuristic algorithms
Mathematical models
Job shop scheduling
Renewable energy sources
Task analysis
Resource-Constrained Project Scheduling
singular activities
genetic algorithm
neighbourhood swapping
forward-backward improvement

Journal

IEEE Access cover
IEEE Access
IF:
3.6
Papers:
9.8W
Citations:
29.4W

Organization

No organization information available
Cited Papers

Cited Papers

People and elephants in the Shimba Hills, Kenya
err2022-08-16
err0
PREAI
errTimothy J. Knickerbocker; John Waithaka
errShare
errSave
An evolutionary approach for resource constrained project scheduling with uncertain changes
err2021-01-01
err25
PREAI
errZaman, Forhad; Elsayed, Saber; Sarker, Ruhul; Essam, Daryl; Coello Coello, Carlos A.
errShare
errSave
A hybrid genetic algorithm for the resource-constrained project scheduling problem
err2008-03-01
err200
PREAI
errValls, Vicente; Ballestin, Francisco; Quintanilla, Sacramento
errShare
errSave
Resource Constrained Project Scheduling With Dynamic Disruption Recovery
err2020-01-01
err9
errOAAI
errZaman, Forhad; Elsayed, Saber M.; Saker, Ruhul; Essam, Daryl
errShare
errSave
errShare
errSave
CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
errShare
errSave
researcher View more