Return
Impacs - A bus crew scheduling system using integer programming
PRE
AI
DOI:10.1007/bf01589402.png)
Abstract
En
Vehicle and Crew Scheduling for Flexible Bus Transportation Systems
2018-06-01
54
Boyer, Vincent; Ibarra-Rojas, Omar J.; Rios-Solis, Yasmin A.
PREAI
An integer programming approach to generating airline crew pairings
2009-04-01
35
AhmadBeygi, Shervin; Cohn, Amy; Weir, Marshall
PREAI
A simulation scenario based mixed integer programming approach to airline reserve crew scheduling under uncertainty
2016-04-13
12
OAAI
Bayliss, Christopher; De Maere, Geert; Atkin, Jason A. D.; Paelinck, Marc
Parallel integer optimization for crew scheduling
2000-01-01
15
Alefragis, P; Sanders, P; Takkula, T; Wedelin, D
PREAI
An Integer Linear Programming Model for the Crew Re-Scheduling Problem Under Crew Unavailability in Urban Rail Transit
Vehicles
2026-05-07
1
OAAI
Yang, Songpo; Wu, Yumiao; Zhao, Mengjiao
IF2.2
A dynamic programming based algorithm for the crew scheduling problem
1998-07-01
34
Beasley, JE; Cao, B
PREAI
Set partitioning/covering-based approaches for the integrated vehicle and crew scheduling problem
2008-05-01
69
Mesquita, Marta; Paias, Ana
PREAI
Vehicle routing and crew scheduling for metropolitan mail distribution at Australia Post
2006-08-01
40
Hollis, B. L.; Forbes, M. A.; Douglas, B. E.
PREAI
Journal
No journal information available
Organization
No organization information available
Cited Papers
No cited papers available

