arrow
Return

Implicitly constrained substation model for state estimation

delete2002-08-01
delete30
PRE
AI
J
Jaén, ADV
A
Antonio Gómez‐Expósito
DOI:10.1109/TPWRS.2002.800979delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper addresses the problem of including detailed substation models in state estimation at the least possible cost. After reviewing existing alternatives, it is shown how Lagrange multipliers associated with topological constraints can be easily computed from an implicit model the size of which is slightly larger than that of the conventional bus-branch approach. This allows bad data and topological error processing to be carried out simultaneously.
Keywords:
generalized state estimators
substation models
topology errors
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

IEEE Transactions on Power Systems cover
IEEE Transactions on Power Systems
IF:
7.2
Papers:
1.1W
Citations:
5.0W

Organization

No organization information available
Cited Papers

Cited Papers

A robust estimation method for topology error identification
err1999-01-01
err87
PREAI
errMili, L; Steeno, G; Dobraca, F; French, D
errShare
errSave
Coordination Chemistry of Aliphatic, Tripodal Ligands with Zinc Salts
err2003-11-24
err0
PREAI
errF. Ekkehardt Hahn; Christoph Jocher; Thomas Lügger; Tania Pape
errShare
errSave
Generalized state estimation
err1998-01-01
err246
PREAI
errAlsac, O; Vempati, N; Stott, B; Monticelli, A
errShare
errSave
no more