arrow
Return

Incremental network design with maximum flows

delete2015-04-01
delete44
delete
OA
AI
T
Thomas Kalinowski *
D
Dmytro Matsypura
M
Martin Savelsbergh
DOI:10.1016/j.ejor.2014.10.003delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
We study an incremental network design problem, where in each time period of the planning horizon an arc can be added to the network and a maximum flow problem is solved, and where the objective is to maximize the cumulative flow over the entire planning horizon. After presenting two mixed integer programming (MIP) formulations for this NP-complete problem, we describe several heuristics and prove performance bounds for some special cases. In a series of computational experiments, we compare the performance of the MIP formulations as well as the heuristics. (C) 2014 Elsevier B.V. All rights reserved.
Keywords:
Network design
Approximation algorithms
Scheduling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

U
University of Sydney
Scholars:
6.5W
Papers: 6.2W
Citations: 90
U
university system of georgia
Scholars:
7.3W
Papers: 6.5W
Citations: 101
U
University of Newcastle
Scholars:
1.5W
Papers: 1.5W
Citations: 16
researcher View more organizations