Inter-phase feedbacks in construction projects

delete2015-07-29
delete59
PRE
AI
K
Kiavash Parvan *
H
Hazhir Rahmandad
A
Ali Haghani
DOI:10.1016/j.jom.2015.07.005delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Understanding diverse performance trajectories of projects is of interest to operations researchers and practitioners. Interactions between multiple phases of a project are commonly assumed to be important in project dynamics, yet the strength of these feedback mechanisms has not been rigorously evaluated. In this study we use data from 15 construction projects to estimate the feedbacks between design and construction phases. The estimated factors reveal that undiscovered design rework diminishes construction quality and production rate significantly and construction completion speeds up the detection of undiscovered design rework. Together, these feedbacks can explain as much as 20% of variability in overall project costs. Comparison of model predictions with a separate set of 15 projects shows good predictive power for cost and schedule outcomes and their uncertainty. The estimation and prediction framework offers a template for using data from multiple cases to estimate both case-specific and industry-wide parameters of project models, and for leveraging those estimates for project planning. (C) 2015 Elsevier B.V. All rights reserved.
Keywords:
Project management
Feedback
Construction
Design
System dynamics
Estimation
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Journal of Operations Management cover
Journal of Operations Management
IF:
10.4
Papers:
1.7K
Citations:
1.2W

Organization

University System of Maryland cover
University System of Maryland
Scholars:
6.4W
Papers: 5.6W
Citations: 113