INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT

delete2020-06-10
delete8
delete
OA
AI
M
Morteza Bagherpour
M
Mohammad Khaje Zadeh
A
Amin Mahmoudi *
邓
邓小鹏 (Xiaopeng Deng)
DOI:10.3846/jcem.2020.12182delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM). EVM is a well-known approach in project management context that can monitor schedule and cost performance indexes in projects simultaneously. The EVM detects current project performances and also predicts at completion costs of the project. In this study, employing Interpretive Structural Modelling, interactions which exist among affecting factors on EVM's success are determined. First, all of the practical factors on EVM are determined and categorized into four main clusters; then the most effective ones are separated from the clusters; eventually, ISM is used based on eleven ultimate critical criteria. The results demonstrate that Instability in the construction market and Macroeconomic indicators are the most influencing factors affecting the EVM. Finally, a novel method for enhancing the performance of conventional EVM is presented. The proposed approach would be highly applicable for engineering managers who are willing to promote the current performance of the systems. Most studies have been previously carried out on the applications of the EVM in terms of improving final cost and total duration elapsed whereas there is not any particular study on the EVM issue which has stated the key factors that influence the EVM and lasting effect on the project performance. It should be noted that the proposed approach can be employed through the life cycle of any project particularly in construction projects.
Keywords:
Earned Value Management
interpretive structural modelling
schedule and cost performance indexes
CPI
at completion costs

Journal

J
Journal of Management in Engineering
IF:
7
Papers:
3.1K
Citations:
6.8K

Organization

S
southeast university - china
Scholars:
5.3W
Papers: 4.9W
Citations: 57
Cited Papers

Cited Papers

errShare
errSave
Molecular sex determination of 20 bird species protected in the Republic of Serbia
err2013-01-01
err0
errOAAI
errMarija Stevanov-Pavlovic; M. Vucicevic; Jasna Bosnjak; Jevrosima Stevanovic; V. Dimitrijevic; Radmila Resanovic; Z. Stanimirovic
errShare
errSave
Climate affects neighbour‐induced changes in leaf chemical defences and tree diversity–herbivory relationships
err2020-10-31
err0
errOAAI
errCharlotte Poeydebat; Hervé Jactel; Xoaquín Moreira; Julia Koricheva; Nadia Barsoum; Jürgen Bauhus; Nico Eisenhauer; Olga Ferlian; Marta Francisco; Felix Gottschall; Dominique Gravel; Bill Mason; Evalyne Muiruri; Bart Muys; Charles Nock; Alain Paquette; Quentin Ponette; Michael Scherer‐Lorenzen; Victoria Stokes; Michael Staab; Kris Verheyen; Bastien Castagneyrol
errShare
errSave
Removal of COD, ammoniacal nitrogen and colour from stabilized landfill leachate by anaerobic organism
err2013-02-16
err0
errOAAI
errMohamad Anuar Kamaruddin; Mohd Suffian Yusoff; Hamidi Abdul Aziz; Nur Khairiyah Basri
errShare
errSave
researcher View more