Return
IWRM and developing countries: Implementation challenges in Ghana
DOI:10.1016/j.pce.2011.06.007.png)
Abstract
En 中文
Since 1990, there has been growing theoretical consensus on the need for integrated water resource management. At the same time, there is growing empirical evidence that challenges the scientific consensus and the practical implications of implementing IWRM in the developed and the developing countries, although the nature of the implementation challenges may differ in the different contexts. Against this background, this paper investigates into the nature of the empirical challenges to implementing integrated water resource management in Ghana. It describes the actual implementation process and contrasts eleven elements of the substantive content of IWRM with the implementation practice in Ghana. The paper then concludes that Ghana, like other developing countries often adopts such paradigm shifts in the management of their water resources primarily as a result of exogenous pressures (and to a limited extent endogenous factors) but that (a) lack of domestic ownership and leadership of the concept, (b) limited resources, and (c) institutional mis-matches, often results in an implementation of the ideas that is limited to implementation in form rather than practice. (C) 2011 Elsevier Ltd. All rights reserved.
Keywords:
Integrated water resource management
Implementation challenges
Water law
Water management paradigm
Ghana
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
4.1
Papers:
3.6K
Citations:
6.9K
Organization
Cited Papers
Effect of Small Reaction Locus in Free-Radical Polymerization: Conventional and Reversible-Deactivation Radical Polymerization
Polymers
IF0

