Logic-based Benders method for multi-skill resource-constrained project scheduling with allocation and skill flexibility
C
C
P
R
DOI:10.1016/j.ejor.2026.05.005.png)
Abstract
En 中文
• A multi-skill scheduling problem with allocation and skill flexibility is studied. • A new exact logic-based Benders decomposition approach is developed. • The master problem solves scheduling using constraint programming. • Subproblems verify allocation feasibility via integer programming. • This approach outperforms a monolithic constraint programming model.
Keywords:
multi-skill scheduling
logic-based Benders decomposition
constraint programming
integer programming
resource-constrained project scheduling