arrow
Return

MACROS: Multiobjective automated construction resource optimization system

delete2006-07-01
delete36
PRE
AI
A
Amr Kandil *
K
Khaled El‐Rayes
DOI:10.1061/(ASCE)0742-597X(2006)22:3(126)delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper presents the development of a practical and automated system for optimizing the utilization of construction resources to simultaneously minimize project cost and duration while maximizing project quality. The system is named the Multiobjective Automated Construction Resource Optimization System (MACROS), and it incorporates four newly developed modules: (1) a multiobjective optimization module to quantify and optimize the impact of resource utilization decisions on construction duration, cost, and quality; (2) a relational database module to facilitate the storage and retrieval of construction scheduling and optimization data; (3) a middleware module to provide seamless integration between the internal modules in MACROS and external commercially available project management software; and (4) a user interface module to facilitate the input of project data and the visualization and ranking of the generated optimal construction plans. An example project of 180 activities is analyzed to illustrate the use of MACROS and demonstrate its unique and practical construction optimization capabilities.
Keywords:
construction management
optimization
resource management
construction costs
quality control
databases
information technology (IT)
computer aided scheduling

Journal

J
Journal of Management in Engineering
IF:
7
Papers:
3.1K
Citations:
6.8K

Organization

No organization information available