Return
Minimizing makespan in a no-wait flowshop with two batch processing machines using estimation of distribution algorithm
DOI:10.1080/00207543.2016.1140920.png)
Abstract
En 中文
This paper studies the problem of minimising makespan in a no-wait flowshop with two batch processing machines (comprised of a parallel batch processing machine and a serial batch processing machine), non-identical job sizes and unequal ready times. We propose a population-based evolutionary method named estimation of distribution algorithm (EDA). Firstly, the individuals in the population are coded into job sequences. Then, a probabilistic model is built to generate new population and an incremental learning method is developed to update the probabilistic model. Thirdly, the best-fit heuristic is used to group jobs into batches and a least idle/waiting time approach is proposed to sequence the batches on batch processing machines. In addition, some problem-dependent local search heuristics are incorporated into the EDA to further improve the searching quality. Computational simulation and comparisons with some existing algorithms demonstrate the effectiveness and robustness of the proposed algorithm. Furthermore, the effectiveness of embedding the local search method in the EDA is also evaluated.
Keywords:
scheduling
no-wait flowshop
batch processing machines
makespan
estimation of distribution algorithm (EDA)
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
7.3
Papers:
1.1W
Citations:
3.7W

